Karya
Judul/Title Liquefaction Potential Analysis at West Abutment of New Kuning Palu Bridge, Central Sulawesi, Indonesia
Penulis/Author Dr.Eng. Fikri Faris, S.T., M.Eng. (2) ; Prof. Dr.Eng. Ir. Wahyu Wilopo S.T., M.Eng., IPM. (3)
Tanggal/Date 2025
Kata Kunci/Keyword
Abstrak/Abstract This study presents the liquefaction potential analysis on the West Abutment of the New Kuning Palu Bridge. The New Kuning Palu Bridge was built to replace the Kuning Palu Bridge that collapsed in the 2018 Palu Earthquake. One year after the earthquake, a geotechnical investigation was conducted on the West Abutment plan. Liquefaction analysis was performed using the Idriss & Boulanger empirical method. Based on the study, the liquefaction potential in this area is classified as very high, with an IL of 46, and high severity, with an Ls of 69. Liquefaction can cause lateral displacement of 1.8 m and settlement of 0.25 m.
Level Internasional
Status
Dokumen Karya
No Judul Tipe Dokumen Aksi
1Yanuardy_2025_IOP_Conf__Ser___Earth_Environ__Sci__1488_012062.pdf[PAK] Full Dokumen