Karya
Judul/Title A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem
Penulis/Author Ir. Achmad Pratama Rifai, S.T, M.Eng, Ph.D (1) ; Setyo Tri Windras Mara (2); Ir. Rachmadi Norcahyo, S.T., M.T (3)
Tanggal/Date 2022
Kata Kunci/Keyword
Abstrak/Abstract The job sequencing and tool switching problem is a combinatorial optimization problem that commonly happens in a flexible manufacturing system environment. In this type of environment, a set of flexible manufacturing machines can be configured with various tools to process different jobs and the requirement to switch tools may correspond to a reduction of productivity. Consequently, research on the job sequencing and tool switching problem has been concentrated on minimizing the number of tools switches. This paper discusses the sequence-dependent job sequencing and tool switching problem. The sequence-dependent job sequencing and tool switching problem extends the standard model by considering non-uniform setup times since industrial applications indicate that a tool setup time might be influenced by the previously installed tool at the same magazine slot. A two-stage heuristic procedure is developed here. In the first stage, an adaptive large neighborhood search is deployed for finding the near-optimal job sequence. Then, in the second stage, a combination of the Keep Tool Needed Soonest policy and simulated annealing is proposed for the tooling sub-problem. Comprehensive computational experiments are carried out to demonstrate the efficacy and robustness of the proposed method for solving the sequence-dependent job sequencing and tool switching problem
Rumpun Ilmu Teknik Industri
Bahasa Asli/Original Language English
Level Internasional
Status
Dokumen Karya
No Judul Tipe Dokumen Aksi
11-s2_0-S0360835221007178-main_Achmad Pratama R.pdf[PAK] Full Dokumen
2form-L1-permohonan_penghargaan-karya-ilmiah-sudah-terbit-2022.pdfDokumen Pendukung Karya Ilmiah (Hibah, Publikasi, Penelitian, Pengabdian)
3A two-stage heuristic for the sequence-dependent job sequencing and tool switching problem.pdf[PAK] Cek Similarity
41_2_3_4_5_merged.pdf[PAK] Bukti Korespondensi Penulis